The building process at Brill Road started by excavating for footings and cutting the slope on the upper end of the hill to produce the appropriate amounts of fill on the lower end of the yard. Next the masonry walls and steps were built, followed by the masonry stone terrace and antique brick walks. Once the arbor was built and stained, and the eyebrow copper window awnings were installed, the plants and finished touches were applied to the space.